Collective hits gold in rock classed as waste at Apollo
Gold
Silver
AI desk brief
Collective Mining reported that 15 of 17 holes in Apollo’s shallow halo intersected grades above the open-pit cut-off in rock currently classified as waste. Intercepts included 107.85 metres grading 0.79 g/t gold and 14 g/t silver; these are drilling lengths, not established true widths. National Bank analyst Don DeMarco said converting waste to mill feed could improve pit economics. A resource update is planned for late 2027 or early 2028, followed by an initial economic assessment; up to $1 billion of further investment through 2030 depends on licensing. The results do not establish a material near-term bullion supply effect.
Sources used
- S1 Mining.com — Collective hits gold in rock classed as waste at Apollo